Failure Prevention Interview Questions

 
1.
Total productive maintenance (TPM) has 5 goals. Which of the following is not a goal of TPM?
2.
The reliability of an operation is normally NOT improved by one of the following procedures:
3.
The Japanese-inspired concept of fail-safe (poka-yoke) seeks to prevent human mistakes. Which of the following are not examples of poka-yoke?
4.
Failure mode and effect analysis (FMEA) provides a checklist procedure. Which of the following questions is not likely to feature on the checklist?
5.
The �bath-tub� curve indicates failure probability. Which stage is not normally associated with the Bathtub curve?
6.
What are types of failure?
7.
Total productive maintenance (TPM) has 5 goals. Which of the following is not a goal of TPM?
8.
The reliability of an operation is normally NOT improved by one of the following procedures:
9.
The Japanese-inspired concept of fail-safe (poka-yoke) seeks to prevent human mistakes. Which of the following are not examples of poka-yoke?
10.
Failure mode and effect analysis (FMEA) provides a checklist procedure. Which of the following questions is not likely to feature on the checklist?
11.
The �bath-tub� curve indicates failure probability. Which stage is not normally associated with the Bathtub curve?
12.
What are types of failure?